branchrust_reboot/main/building_system_3.2cancel
12 Commits over 0 Days - ∞cph!
Removed leftover support sockets from roof
Workaround for using half height floors as shelves behind doors / wall frames
Better wall stacking prevention via new building proximity component (reduced false positives and false negatives)
Fixed server side stair collider rotation sometimes being incorrect after rotating
Don't use triangular wall conditional model if there's a neighboring wall attached to the invisible side
Include wall sockets in building proximity checks
Added dummy floor socket at half height of the full wall (support only)