Cranked the flicker floor up more.
The ~100hz neon flicker varies a little for each sign type. All use primes for both ints and decs to avoid waveforms ever fully syncing.
Slightly raised the bottom floor of the wave.
updated the building topology and added a collider for tree guards
adding art for tree_guard_fences, prefabs
some splat repaint to fit the ground below trees
adding models and final prefab for the nova apartments sign
added renderer batch on new bench prefabs
some tweaks to scene
Communal interior material fixes
untangled changes from erik's prefab and changes from this AM
move the walls corridor to the grid
added collision for the corridor
blockout playground models from yesterday
some visual tweaks to bench_b
adding more decorative benches to replace the large bulky one
replaced the old one with new ones in scene
also plugged some doorways in the apartment_b prefabs
Finalized D.
B fixes.
Scene backup.
Fixed apartment lights having a bunch of unintended culling layers and causing warnings.
Cleaned C and set correct layers.
Shifted a sign for render order purposes.
mosaic from previous hackweek
Lights only at night.
More B fixes.
Refactored stuff for the layer warning.
Apartments complex basement progress
adding new version of the apartment corridor
LOD3s for Rentable Shop D, E, F. Replaced model of kiosk E with prefab version.
Submitting large apartment work I forgot to submit on fri night
prefabed camping cooker and added colliders
changed model to prefab in small apartment
Prefabbed up Kiosk B structure + decals as were still only models, plus prefab setup. LOD3s for Kiosk A, B, C (batched together). Removed obsolete kiosk C blockout.
Replaced static meshes in Kiosk C prefab with prefab versions. Organised hierarchy.
Neon prefabs to default layer for ref probe purposes.
Thicker door frame for entrance
Entrance a / removed overlapping geo
A, B, C lighting prefabs.
Layer stuff for remaining interior shells.
Scene backup.
Removed backfaces from apartment comples b entrance
Work on ceiling of penthouse, and bathroom. Enabled AO on medium apartment ceiling material.